top of page

The Quarry

Land Development, Stormwater

J.R. Evans partnered with Centex Homes on a nearly seven-year, 846-acre project that included PUD rezoning from a rock mine to a residential golf community for 1,028 families/individuals. We started with a major on-site analysis of the contributing watershed that utilized a hydrologic model to establish the timing and rate of off-site flows from an existing property. After evaluating flow-way basin staging with the development basins, we designed residential development basins in a way that would not impact floodplain storage, but would improve water quality.

Project Gallery

jre footer.png

Corporate Headquarters
9961 Interstate Commerce Drive, Suite 230
Fort Myers, FL 33913
Main Phone: 
239.405.9148

Sarasota
5589 Marquesas Circle, Suite 102
Sarasota, FL 34233
Office: 
941.355.6636

  • Instagram
  • Facebook
  • LinkedIn
Unknown.png

© 2025 by JR Evans Engineering. Powered and secured by Wix 

bottom of page